All internal combustion engine
piston and connecting rod installation method is the same. Detailed installation process need a lot of
space, installation steps below summary:
To
install the connecting rod (head) with piston pin in the pin hole of piston.
Install the piston ring (gas ring, oil ring) on
the piston ring groove.
The
connecting rod, piston assembly installed from above the cylinder, the big end
inserted down (up) piston in the cylinder (blocked because of piston ring and
plug no bottom).
With a
special fixture installation of piston ring (made of thin sheet metal tools),
to make sure they skim piston ring to adjust the abutment of the piston ring
before (banding, adjust good neighboring right ring two opening Angle, general
each other between 120 degrees apart) and the cylinder liner inside diameter of
the same size, and then gently push (enter to facilitate, temporary put some
oil in piston ring lubrication) cylinder liner,
Connecting
rod is installed on the connecting rod journal, its two fastening bolts, which
one to the left side of the body, to the right side of the body, which is a
direction, not wrong, wrong, crank shaft can not rotate for 360 degrees in the
body.
Fastening
two of connecting rod bolt, meet the requirements of torque.
Cylinder
head was installed and adjusted the valve clearance.
Installed
oil pump, fine oil sump.